Contractors in Colombia: what SG-SST software should support before, during and after work

Contractor management in Colombia needs to follow the activity throughout the service. Initial documentation matters, alongside personnel changes, hazards arising during execution and actions left outstanding when work ends. Evaluate SG-SST software against this complete journey rather than only the initial document submission stage.
Article 2.2.4.6.28 of Decree 1072 of 2015 addresses selection, communication, verification of affiliation to the General Occupational Risk System and preventive information, among other matters. The working process must reflect the contract and its risks. Spain’s CAE model should not be transferred automatically to Colombian operations.
Before the service: define the actual work
Identify the contractor company, contract owner, location, tasks, duration and expected personnel. Describe interactions with normal operations and other work. This information determines which checks and instructions are relevant. Requesting the same document package from every contractor can conceal important differences between the assignments.
Record the OSH considerations reviewed during selection and the conditions to be resolved before work begins. Distinguish information received, technical review and the operational decision. A “document uploaded” checkbox does not explain who checked the content or which activity that assessment covered.
The Explora entry on the OSH management system places contracting within overall management. The record should connect the service to the contracting organisation’s responsibilities and controls, allowing users to understand its operational context rather than viewing an isolated folder of files.
Prepare the start with understandable information
Arrange the relevant affiliation checks and communicate general hazards, area-specific risks and emergency measures. Define how to check that the people actually arriving at the site have received the appropriate information. The decree addresses personnel turnover, so the original workforce list cannot be treated as permanent.
During a demonstration, replace a worker before the first day. Check which records require review, who receives the notification and how the applicable instruction version is identified. This example tests an ordinary change without turning the application into an automatic decision about whether the service can proceed.
During execution: manage changes
Establish channels for reporting incidents, unsafe conditions and changes to the work. If equipment, location, working hours or methods change, the responsible person should assess the implications for planned controls. The Explora entry on change management in OSH helps structure this review and identify its owners.
A software assessment can include these questions:
- Can an observation be connected to the relevant company, person and task?
- How are actions assigned and their implementation checked during the contract?
- What happens when a verification expires or the work team changes?
- How is communication about a relevant modification preserved?
- Can each contractor’s access be limited to the information it needs?
These are requirements to verify with the supplier. They must become specific configuration and procedural decisions, with a person responsible for acting on each result. A notification has limited value if its recipient does not know what decision or follow-up is expected.
After the work: close the service and retain what matters
Operational closure should review completed work, handover conditions, incidents and outstanding actions. Administrative closure may occur at another time. Keeping them separate prevents an unresolved correction from disappearing because procurement already considers the contract finished and no longer reviews its activity.
Assess performance against known criteria and recorded facts. Preserve relevant evidence under applicable obligations and restrict access when the relationship ends. The Explora entry on digital evidence in prevention provides general principles for retaining record context without replacing the Colombian rules applicable to each category.
Test the complete journey with one case
Imagine a contractor maintaining a warehouse. During the assignment, two team members change and the work moves to a different area. A useful test shows information review, assessment of the change, communication of the decision and follow-up of resulting actions. This is an illustrative case, not a customer experience claim.
Connect this assessment to choosing SG-SST software in Colombia and managing groups by NIT and site. When considering Sabentis OSH software, describe your contracting model to define the workflows, permissions and evidence that your organisation needs to manage.
A practical checklist for contractor follow-up
Select an active contract and review a situation that has changed since work began. These checks help establish whether the file reflects the people and tasks actually involved in the service.
- Compare the planned personnel list with the people who attended the workplace and resolve relevant differences.
- Check that replacing a team member triggers the preventive information review and checks relevant to the new person.
- Identify an operational channel for reporting hazards during the task, including arrangements when the usual contact is absent.
- Separate submitted documents from completed checks and record who assessed the evidence for the specific service.
- Review outstanding measures when the contract closes and transfer them to an owner who retains the ability to resolve them.
Frequently asked questions about contractors and SG-SST software
Is checking occupational-risk affiliation once at contract start enough?
Article 2.2.4.6.28 provides for checks before work begins and periodically, taking personnel turnover into account. The procedure should identify changes and repeat the relevant checks. Retaining an unchanged initial list can leave out people who join the team later during the contracted service.
Who should communicate hazards in the working area?
The Colombian framework requires suppliers, contractors and their workers to receive information about relevant hazards and risks before the contract starts. The company should organise that communication and maintain it when circumstances change, using understandable content connected to the actual activity being performed.
Should every contractor submit the same documentation package?
Documentation should reflect obligations and the service’s risks. Define shared requirements and others linked to the task, people and conditions. An identical package for everyone can increase administration without demonstrating that the decisive issues for each intervention have been identified and assessed.
May one contractor consult records belonging to other companies?
Access should have an appropriate purpose and authorisation. Limit permissions to necessary information and test searches, documents and exports as well. In Colombia, the restricted-access, security and confidentiality principles of Act 1581 guide the handling of personal data when information is shared with third parties.
Legislation and sources consulted
- Colombia: Decree 1072 of 2015: Colombia, Article 2.2.4.6.28: communication, affiliation, personnel turnover and verification during contracting.
- Colombia: Data Protection Act 1581 of 2012: Colombia, Article 4: restricted access and circulation, security and confidentiality when personal data is shared with third parties.
Sources consulted on 6 October 2026. Checklists and examples are practical implementation proposals.



