Occupational safety and health in ship recycling

Occupational safety and health in ship recycling organises preparation and dismantling at the end of a vessel’s useful life. Recovering steel and components requires control of hazardous materials, atmospheres, energy and changing stability at every stage.

In brief

Protection depends on a ship-specific plan and verification of actual conditions before work. Sustainable recycling does not mean risk-free breaking or unrestricted permission to cut.

Contents
  1. What ship recycling includes
  2. International convention and applicable law
  3. Hazardous-material inventory and verification
  4. Decontamination and asbestos management
  5. Confined spaces and entry conditions
  6. Hot work and fire control
  7. Dismantling sequence and structural stability
  8. Access, falls and auxiliary energy
  9. Exposure, ergonomics and working conditions
  10. Contractors, changes and emergency response
  11. Hypothetical example: unexpected material before cutting
  12. Indicators and traceable improvement
  13. Frequently asked questions
  14. Related concepts
  15. Sources and references

A–Z dictionary

What ship recycling includes

Recycling a ship involves more than cutting steel. It includes preparing arrival, understanding its history, removing materials and waste, dismantling equipment, separating blocks and managing recovered products. Configuration changes as bulkheads, decks and systems disappear; an access route or support valid at the start may cease to be suitable.

Assessment must describe the particular vessel and receiving facility’s capability. Procedures from ordinary ship repair or a different vessel type cannot simply be transferred unchanged. “Sustainable” describes an intention or performance requiring evidence; it does not remove preventive duties or establish that workers may enter every compartment. Conditions need verification at each phase, including less-visible preparation tasks that precede the main dismantling operation.

Sources: [1] [3]

International convention and applicable law

The Hong Kong Convention entered into force on 26 June 2025. Applicability must be checked against states, vessel and facility rather than interpreted as worldwide authorisation of every operation. Within the European Union, Regulation 1257/2013 establishes a separate regime with scope, exclusions, documentation duties and recycling conditions.

Analysis should identify flag, vessel type, facility and work jurisdiction. In Spain, the relevant occupational prevention rules also apply. ILO and OSHA material provides technical reference points, but recommendations or US legal provisions do not automatically become Spanish obligations. The intended destination needs checking against requirements that actually apply, including eligibility conditions for the receiving facility. Treaty entry into force alone does not settle those questions.

Sources: [1] [2] [8]

Hazardous-material inventory and verification

An inventory of hazardous materials helps locate substances and components relevant to dismantling plans. It must be connected to drawings, history, inspections and what is actually found. Old or incomplete documentation does not demonstrate absence of contamination, and visual inspection cannot reliably identify every substance present.

A practical record links each area or component to identified material, uncertainty, verification method and planned action. Cargo residues, fuels, oils and stored products also matter. Discovery of uncharacterised material requires review of the affected task before continuation. The inventory supports decisions; it does not replace exposure assessment or energy control. Updates need to reach the teams whose work depends on the information rather than remain in an administrative file.

Sources: [2] [6]

Decontamination and asbestos management

Hazardous materials need a removal sequence that avoids dispersal during later cuts or movements. Insulation, gaskets, coatings and equipment may require specific checks, without attributing asbestos or metals to every component solely because of age or appearance. Planning should define segregation, access, resources and waste destination.

In Spain, work involving asbestos exposure risk falls under Royal Decree 847/2026, including applicable transitional provisions. The former regime should not be presented as current without checking that transition. Removal belongs with companies and personnel meeting the required conditions. This article does not authorise asbestos sampling, removal or packaging through improvised instructions or unsuitable equipment. Compliance for the particular work must be established before disturbance.

Sources: [5] [6] [2]

Confined spaces and entry conditions

Tanks and compartments can contain hazardous atmospheres, restricted access or unexpected substance inflows. Safe-entry conditions must be established and maintained for the specific task. Opening a hatch, ventilating for an arbitrary period or possessing an old measurement does not prove that the space remains safe.

Organisation must control access, isolation, atmosphere, communication and rescue capability through specific procedures. Work in adjacent spaces capable of changing conditions also requires review. Certificates and permits have a defined scope and conditions; they are not unlimited authorisation for another team, shift or activity. Rescue entry requires preparation and equipment rather than an improvised reaction. Planned emergency arrangements must remain feasible as the vessel’s layout changes during dismantling.

Sources: [2] [4]

Hot work and fire control

A space suitable for entry is not automatically suitable for cutting, welding or spark-producing work. Hot work adds ignition sources and may heat residues or materials on the other side of a plate. Adjacent compartments, combustible material and continuing conditions throughout the operation need consideration.

The procedure should define authorisation, checks, monitoring and response to change. Hoses, cylinders and cutting equipment require organisation and maintenance suited to the surroundings. An initial signature must not replace supervision of changing conditions. This article provides neither cutting techniques nor atmospheric parameters; competent professionals must establish those criteria within the applicable framework. A changed task requires review of its authorisation before it starts, rather than reliance on an earlier permit.

Sources: [2] [4]

Dismantling sequence and structural stability

Each removal changes load distribution, strength, supports and access routes. The dismantling sequence needs engineering planning to prevent unexpected block falls or loss of stability. An apparently secondary element may support another part, particularly where corrosion or previous damage exists.

The plan coordinates cutting, restraint, lifting and placement with exclusion areas and clear communication. Section weight must not be improvised from appearance, nor every attachment point assumed suitable for lifting. Changes to the plan require review before execution. A crane’s nominal capacity alone does not establish that the whole lift is safe; configuration, accessories, route and support conditions also matter. The receiving area should be ready before a section is released and moved.

Sources: [3] [7]

Access, falls and auxiliary energy

Gangways, stairs and openings change during dismantling. Appropriate access to every authorised work area must be maintained, while removed materials should not obstruct circulation or escape. Fall protection must suit the task and available structure; any point on the hull cannot automatically be treated as a suitable anchor.

Electrical, hydraulic and pneumatic circuits and auxiliary equipment also need identification, including temporary supplies. Removing a system does not guarantee absence of energy in all branches. Appropriate isolation and verification precede intervention. Work near water adds protection and rescue needs that must be planned for the facility and task. Changes should be communicated to other contractors rather than assumed obvious from the appearance of the work area.

Sources: [4] [7]

Exposure, ergonomics and working conditions

Cutting, cleaning and handling may generate fumes, dust, skin contact, noise and physical demands. Assessment should identify materials and tasks, including nearby workers and contractors. Measurements are designed around plausible agents and representative conditions; outdoor environmental data do not replace personal exposure assessment during work inside a vessel.

Priority lies in controlling emissions, designing access and reducing exertion through suitable organisation and equipment. PPE supplements those measures and requires selection compatible with the hazards. Health surveillance must preserve confidentiality and respond to assessed exposure. Working in shipbreaking does not itself establish a disease diagnosis, and every symptom cannot automatically be attributed to one agent. Clinical conclusions require competent assessment of the relevant evidence.

Sources: [4] [6] [8]

Contractors, changes and emergency response

Concurrent decontamination, cutting, lifting and transport require coordination of actual interfaces. Each supervisor needs to know released areas, incompatible tasks and conditions requiring suspension or reassessment. Shift handover must communicate structural changes and permits as well as production progress.

Emergency response is prepared for vessel and facility scenarios, with assistance access, communication and feasible rescue. A generic office plan is insufficient. Exercises should test practical difficulties without unnecessarily exposing participants. Productivity must be organised within preventive conditions rather than contractual pressure being used to continue after a safety condition is lost. Response arrangements also need review when dismantling changes access routes or makes earlier assembly and rescue locations unsuitable.

Sources: [3] [8]

Hypothetical example: unexpected material before cutting

While preparing a section for dismantling, workers find insulation not identified in the available inventory. The affected operation stops and the area remains controlled while the material is characterised and nearby work reviewed. The team does not conclude that it is asbestos from a photograph or that it is harmless because it is absent from the list.

Competent professionals then determine treatment and adjust removal and lifting sequence. Conditions for resumption are recorded. This hypothetical case illustrates the operational importance of inventory uncertainty and how one finding can change several tasks. An earlier permit is not immutable authorisation: the revised decision must reflect new evidence and clearly assigned responsibilities before work restarts.

Sources: [2] [5] [7]

Indicators and traceable improvement

Suggested indicators include areas with verified inventories, uncertainties resolved before intervention, permits reviewed after change, planned lifts and corrective actions checked for effectiveness. These are proposed management measures, not a universal standard or substitutes for legal requirements. Waste traceability should remain distinct from evidence about the safety of operations producing that waste.

A high material-recovery percentage does not demonstrate low exposure or absence of incidents. Review should include suspended work, reports and difficulties raised by workers without penalising reporting. Closeout identifies what was checked, what changed and which records must be retained. Certificates, measurement results and medical records have different purposes and access rules; they should not be treated as interchangeable or universally public evidence.

Sources: [2] [8]

Frequently asked questions

Does sustainable recycling mean safe shipbreaking?

Not automatically. Material recovery requires demonstrated planning and controls for each task and phase.

Does an entry permit allow cutting inside a tank?

Not by itself. Entry and hot work have different conditions that must be established and maintained for the authorised task.

Can asbestos be recognised by sight?

Appearance cannot reliably confirm or exclude it. Competent identification and applicable requirements must be followed.

Does the Hong Kong Convention replace all national law?

No. Its scope, relevant EU rules and national duties for work, facilities and materials must all be checked.

Request a Demo

Discover all that Sabentis can do for your organization.

Try Sabentis

request a demo
stars 5
GetApp Software Advice Capterra