A process change can affect safety, workload, training and material use at the same time. If each department reviews only its own concerns at the end of the project, conflicting decisions may emerge. Vision Zero and Cultura 5Z offer references for broadening the discussion and organising it from the beginning.

Vision Zero is ISSA’s strategy focused on safety, health and wellbeing, supported by its official guides. Cultura 5Z incorporates five dimensions in the Fundación Internacional ORP model. The following case proposes practical coordination between the initiatives. It is neither an official mapping of the models nor a customer case study.

The case: reorganising an order preparation area

Imagine a company reorganising the packing of customer orders. It wants to improve workflow and reduce wasted materials. The change may also alter routes, reaching distances, physical effort, pace and learning needs. The project begins with a joint workplace visit and discussions involving people from different shifts.

First, define what changes and what stays the same. The team records tasks, equipment, hours, materials and observed problems, with an owner validating each information category. Management agrees that cost and productivity decisions will consider working conditions and environmental effects before the design receives approval.

Allocate responsibilities across departments

OSH coordinates hazard identification and risk assessment within its remit, involving additional specialists as needed. Operations describes process constraints and prepares organisational alternatives. Maintenance reviews changes to equipment and installations. Sustainability supplies material and waste information, while the People team organises information, training and participation needs.

This allocation is illustrative and must reflect each organisation. The Explora entry on change management in OSH helps organise reviews before changes are introduced. No owner should automatically approve a technical matter that requires another professional competence or an assessment not yet completed.

Apply the rules to project decisions

Leadership becomes visible when management resolves a resource need and explains its criteria. Hazard identification enables alternatives to be reviewed before installation. Objectives become tasks, while organisational arrangements establish who validates each stage and which conditions must be satisfied before proceeding further.

Equipment design and maintenance, people’s preparation and their participation complete the process. Vision Zero’s seven Golden Rules provide a reference for these management questions. They do not turn the project into a rigid sequence in which each rule applies only once and can then be forgotten.

Connect the 5Z dimensions to specific questions

The team can review accidents and exposures within preventive assessment and examine materials using the relevant environmental data. It should also check that training and consultation channels reach every shift and that the knowledge needed to carry out tasks is available to the people involved.

These connections preserve separate data and responsibilities. Reduced waste does not demonstrate an ergonomic improvement. One training session does not establish that everyone understood the new procedure. The Cultura 5Z action plan provides a way to define specific objectives for each area without treating different outcomes as interchangeable.

Resolve a decision affecting several areas

Suppose one alternative reduces packaging materials but requires more manual handling. The team needs to assess both consequences and examine possible alternatives. Management needs sufficient information about conditions, resources and outstanding checks, rather than deciding solely on estimated savings in consumables or a single performance measure.

A shared record preserves the alternatives, consulted owners, decision and reasons. If a technical assessment remains outstanding, the status should make that visible. This traceability allows the decision to be revisited when new information appears and prevents an initial assumption from gradually becoming an accepted fact.

Check the process in use and share the learning

Before extending the reorganisation, test the process within a controlled scope and review actual conditions. Collect observations, control performance, learning needs and material data. Assign corrections with owners and closure criteria, then inform participants of the decisions. Their feedback can identify practical effects that were not apparent during design.

The Explora entry on prevention culture explains why response and continuity matter. Organisations in Spain and Colombia can share this coordination approach while adapting assessments and obligations to their particular operations and jurisdiction.

Software can connect the project with tasks, decisions and evidence. When exploring Sabentis OSH software, use this case to test support for cross-department coordination that preserves technical judgement and follows improvements through to verification in use.

A practical checklist for decisions involving several departments

Use this checklist before approving a change shared by Operations, OSH, People and Sustainability. Its purpose is to make disagreements and outstanding checks visible before the project proceeds.

  • Describe where the change could improve one dimension while worsening another, and what information is needed to assess it.
  • Identify who is authorised to validate each technical aspect and the limits of the overall project approval.
  • Plan a test under demanding conditions: a shift change, increased workload or replacement of a key team member.
  • Agree which result would require the rollout to stop and who is authorised to make that decision.
  • Keep relevant objections alongside their responses; do not assume unanimous agreement simply because no comments were recorded.

Frequently asked questions about coordinating Vision Zero and 5Z

Should one person own both initiatives?

Shared coordination is possible, but technical decisions require people with the appropriate competence. Someone can organise meetings and follow-up without validating every discipline. Explain who coordinates, who provides specialist judgement and who approves resources for each action involving several departments or dimensions.

How should a conflict between safety and waste reduction be resolved?

Document the alternatives and their effects before choosing. Lower material use does not justify accepting unsafe conditions. The decision must incorporate preventive assessment, applicable obligations and environmental information, seeking a compatible solution while clearly identifying any questions that remain unresolved before implementation.

Must the same action be recorded twice?

Not necessarily. One project record can retain the shared decision and link to checks specific to each area. Where different tools are used, a common identifier and authoritative source help prevent updates from producing contradictory conclusions or leaving departments working with different versions.

Does combining the initiatives create a new certification or legal requirement?

The coordination proposed in this article is a practical way to organise improvements. It is neither joint certification nor an additional legal obligation. Vision Zero and Cultura 5Z are voluntary initiatives with their own references; any formal recognition must be checked with its issuing organisation.

Sources and methodology

Sources consulted on 6 October 2026. Checklists and examples are practical implementation proposals.

Request a Demo

Discover all that Sabentis can do for your organization.

Try Sabentis

request a demo
stars 5
GetApp Software Advice Capterra