Spain · National · Order

Order ITC/1683/2007 · Safety, documentation and checks for mining products

In force with an amendment; OSH selection and transitional context

Official Spanish title: Orden ITC/1683/2007, de 29 de mayo, por la que se modifican las instrucciones técnicas complementarias 09.0.02, 12.0.01 y 12.0.02, y se deroga la instrucción técnica complementaria 12.0.04, del Reglamento general de Normas Básicas de Seguridad Minera.

On this page
  1. What it regulates
  2. Who it applies to
  3. Key provisions
  4. History and versions
  5. Transitional provisions and application notes
  6. Official BOE legal relationships
  7. Official sources
  8. Explore the concepts in Sabentis Explore

What it regulates

Amends instructions on electricity and conformity assessment for mining products. This selection focuses on documentation needed for safe use, checks of detection and measuring equipment, and conditions for exceptional operations.

Who it applies to

OSH selection from ITC 12.0.01, sections 5, 6 and 7, with context on ITC 12.0.02, the 09.0.02 amendment and repeal of 12.0.04. This is not an updated catalogue of all technical standards or a complete guide to marketing or CE marking.

Key provisions

ITC 12.0.01, section 5. Supply must include documentation for assessing suitability for the intended use and enabling safe installation, operation and maintenance, including the declaration of conformity and relevant instructions. Historical European references require checking their legislative successors.

ITC 12.0.01

Section 6. Detection and measuring equipment on which safety depends requires initial checks and checks after each new installation. Where deterioration may create danger, periodic checks by competent, specialist personnel are required.

ITC 12.0.01

Section 6. Check results are documented, retained throughout the product’s useful life and made available to the mining authority. Periodic calibration follows certification conditions, manufacturer instructions and applicable specific rules.

ITC 12.0.01

Section 7. Exceptional operations using equipment with particular certification difficulties require mining authorisation and a project. The organisation must train personnel, continuously monitor supplementary measures and stop the operation if conditions are breached; it notifies the technical manager of the start and finish.

ITC 12.0.01

History and versions

BOE publication: 13/06/2007 · Initial entry into force: 14/06/2007

BOE-A-2007-11586

Published on 13 June 2007; effective from 14 June 2007. It replaced ITCs 12.0.01 and 12.0.02 and repealed ITC 12.0.04. Order ITC/2107/2009 amended its transitional provision, effective from 4 August 2009. The 2007 electrical amendment must now be read with Order ETU/995/2017.

Adds the transitional exception for specified conveyor-belt approvals and certificates dated on or before 1 January 2002.

Publication: 03/08/2009 · Effective date: 04/08/2009

BOE-A-2009-12907

Subsequent electrical-installation framework: articles 2 and 3 and the transitional provision preserve specified earlier ITCs only in the stated cases, without repealing the original orders in full.

BOE-A-2017-11908
Text versions of the selected OSH provisions

The table includes only versions that introduce or amend the selected OSH subsections. Full article versions changing only other subjects remain in the official sources but are not shown as preventive reforms.

Transitional provisions and application notes

  • The transitional provision, amended in 2009, set one- or three-year replacement periods for approvals and certificates from the 2007 commencement date, with an exception for certain conveyor belts. These are historical periods, not new deadlines. The additional provision covers products properly authorised and in service when the order commenced.

    Transitional provision sole
  • Electricity: Order ETU/995/2017 governs new installations and specified alterations or risks affecting existing installations (article 2). Its inspection regime applies to all, but article 3 retains the original approval criteria for certain older installations. Its transitional provision preserves only the listed earlier ITCs for installations outside the scope of the new ones. This order’s electrical chapter is not presented as a general rule for new installations.

    Transitional provision sole
  • Territorial application: article 2 of Royal Decree 863/1985 distinguishes direct application of the ITCs, supplementary application in autonomous communities with regulatory powers, and regional rules. ITCs on standardisation and approval, and those on explosives, apply directly throughout Spain. The site’s regional rules must be checked.

    Article 2

Official BOE legal relationships

This record covers the history of the selected occupational safety and health provisions. The official analysis also provides the relationships affecting other subjects in the legislation.

Official BOE legal relationships

Official sources

Official sources checked on 16/11/2026. Updating a database record does not by itself mean that the legislation has been amended.

  1. BOE-A-2007-11586 · Original text
  2. BOE-A-2007-11586 · Consolidated text
  3. ELI identifier
  4. BOE-A-2009-12907 · Original text
  5. BOE-A-2017-11908 · Original text
  6. BOE-A-2017-11908 · Consolidated text
  7. BOE-A-1985-10836 · Original text
  8. BOE-A-1985-10836 · Consolidated text
  9. BOE-A-1997-21178 · Original text
  10. BOE-A-1997-21178 · Consolidated text

Official sources checked on 16 November 2026. BOE consolidation is informative; the original and subsequent instruments determine the legal scope. This OSH selection guides consultation and does not replace risk assessment, the project or decisions by competent personnel. Registry update dates are not new commencement dates.

Sabentis editorial translation; it does not replace the official Spanish text.

Editorial information

Publication date: 16 November 2026.

Editorial responsibility: Sabentis editorial team.

Editorial review by Pablo RodríguezLinkedIn

Executive Vice President of the International ORP Foundation and Chief Financial Officer of Sabentis.

Request a Demo

Discover all that Sabentis can do for your organization.

Try Sabentis

request a demo
stars 5
GetApp Software Advice Capterra